Meet 30% of Singapore’s nutritional needs through locally produced food
Agriculture | Intensity target | Target year: 2030
-
Complete formulation of coastal protection plans for City-East Coast, North-West Coast (Lim Chu Kang and Sungei Kadut) and Jurong Island
Coastal zones | Fixed level target | Target year: 2030
-
Target 60,000 charging points nationwide by 2030, including 40,000 in public carparks and 20,000 in - private premises
Transport | Fixed level target | Target year: 2030
-
All new car and taxi registrations to be of cleaner-energy models from 2030
Transport | Fixed level target | Target year: 2030
-
8 EV-Ready Towns with chargers at all HDB carparks by 2025
Transport | Fixed level target | Target year: 2025
-
New registrations of diesel cars and taxis to cease from 2025
Transport | Fixed level target | Target year: 2025
-
Reduce energy consumption in existing HDB towns by 15%
Urban | Base year target | Target year: 2030
-
Reduce desalination energy further to 1kWh/m3
Water | Intensity target | Target year: 2030
-
Green 80% of Singapore’s buildings (by Gross Floor Area), to be Super Low Energy buildings by 2030
Buildings | Intensity target | Target year: 2030 | Base year: 2005
-
Singapore’s first integrated waste and used water treatment facility to be 100% energy self-sufficient (Tuas Nexus)
Waste | Fixed level target | Target year: 2025
-
Reduce energy consumption of desalination process from current 3.5kWh/m3 to 2kWh/m3
Energy | Intensity target | Target year: 2025
-
200 MW of energy storage systems deployment beyond 2025, which can power more than 16,000 households a day
Energy | Fixed level target | Target year: 2030
-
Increase solar energy deployment by five-fold to at least 2 GWp, which can meet around 3% of our 2030 projected electricity demand and generate enough electricity to power more than 350,000 households a year (1.5 GWp by 2025, which can meet around 2% of our 2025 projected electricity demand and generate enough electricity to power more than 260,000 households a year)
Energy | Intensity target | Target year: 2030
-
At least 20% of schools to be carbon neutral
Cross Cutting Area | Fixed level target | Target year: 2030
-
Achieve a two-thirds reduction of net carbon emissions from the schools sector
Cross Cutting Area | Base year target | Target year: 2030
-
Triple cycling paths to 1,320km from 460km in 2020
Transport | Fixed level target | Target year: 2030
-
Expand rail network from around 230km today to 360km by early 2030s
Transport | Fixed level target | Target year: 2030
-
Achieve 75% mass public transport (i.e. rail and bus) peak-period modal share
Transport | Intensity target | Target year: 2030
-
Reduce the amount of waste to landfill per capita per day by 30%
Waste | Base year target | Target year: 2030 | Base year: 2022
-
Reduce household water consumption to 130 litres per capita per day
Water | Fixed level target | Target year: 2030
-
Reduce the amount of waste to landfill per capita per day by 20%
Waste | Base year target | Target year: 2026 | Base year: 2022
-
Add 1000 ha of green spaces
Urban | Base year target | Target year: 2035 | Base year: 2022
-
Every household will be within a 10-minute walk from a park
Urban | Fixed level target | Target year: 2030
-
Increase nature parks’ land area by over 50% from 2020 baseline
Urban | Base year target | Target year: 2030 | Base year: 2020
-
Double our annual tree planting rate between 2020 and 2030, to plant 1 million more trees across Singapore
Urban | Fixed level target | Target year: 2030 | Base year: 2020
-
Develop over 130 ha of new parks, and enhance around 170 ha of existing parks with more lush vegetation and natural landscapes.
Urban | Fixed level target | Target year: 2026 | Base year: 2022