This document seeks to create the fundamentals for the introduction of Green Economy approaches to the development of priority sectors of the national economy. The areas where a green transition should be promoted first are the following: energy,  agriculture, manufacturing, transport, tourism, municipal waste management, and cities.

Documents
  • investment lots to introduce electrical charging infrastructure in Bishkek and Osh (at least 30 charging stations) and along the Bishkek – Osh and Bishkek – Karakol national highways were prepared
    Transport | Fixed level target | Target year: 2023 | Base year: 2019
  • emissions of CO2 and an overall concentration of air pollutants in Bishkek and Osh were decreased
    Urban | Base year target | Target year: 2023 | Base year: 2019
  • A Plan of Activities to Replace (Transition from) the Vehicle Fleet of State Organizations (Ministries and Agencies) with (to) EVs was approved by a Resolution of Government of the Kyrgyz Republic
    Transport | Not applicable | Target year: 2023 | Base year: 2019
  • the share of low-carbon and electrically-powered public transport with special devices for PWD in Bishkek and Osh was increased by 403 units
    Transport | Fixed level target | Target year: 2023 | Base year: 2019
  • climate risks for agricultural producers were mitigated via the introduction of an agricultural insurance system
    Agriculture | Not applicable | Target year: 2023 | Base year: 2019
  • community-based irrigation water and pasture management organizations now possess significant capacity, introduce sustainable management methods and are no more than 70% specific gender-heavy
    Social development | Fixed level target | Target year: 2023 | Base year: 2019
  • reliable and uninterrupted supply of all types of energy and fuel resources to the population was ensured
    Energy | Not applicable | Target year: 2023 | Base year: 2019
  • RES objects of total established capacity of at least 50 MW were commissioned
    Energy | Fixed level target | Target year: 2023 | Base year: 2019
  • energy consumption of residential, public, administrative, multi-functional and non-production building was reduced by 10% by 2023
    Energy | Base year target | Target year: 2023 | Base year: 2019
  • GDP energy intensiveness was reduced by 4,5% by 2023
    Economy-wide | Intensity target | Target year: 2023 | Base year: 2019
from the Grantham Research Institute
from the Grantham Research Institute
Climate Change Laws of the World uses cookies to make the site simpler. Find out more about cookies >>